Altering your Power Connection

If you require an alteration to your power supply or capacity please complete an Installation Connection Application form  below outlining the alterations.

Please Note: if your connection is on the Electricity Southland Limited (Lakeland Network) you need to complete a Lakeland Network application (link below)

Installation Connection Application PDF (276KB)

Lakeland Network Installation Connection Application (PDF 181KB)

Policies relating to Installation Connections are contained in the PowerNet Installation Connection Standard. You can download the Installation Connection Standard here.

Get Adobe ReaderIf you have any queries, please contact the PowerNet Connections Team on telephone 03 211 1899 or by email to connections@powernet.co.nz to discuss your requirements.

Changes to supply cover any of the following:

  • Reconfiguring your power connection – such as new mains or relocating a meter board.
  • Installation of an appliance or equipment that may affect quality of supply – for example, motors or power factor correction.
  • Installation of generation equipment.
  • Requesting a change to the contract supply capacity.

Click on this link for more information about PowerNet’s Specific requirements for lodging an application.

We appreciate as much prior notice as possible to help us meet your timing requirements.